Understanding the Design-Build Timeline
The Myth of the "Fast" Renovation Everyone wants their home finished "yesterday," but quality interior construction requires a logical sequence. We pull back the curtain on how a professional timeline is built, moving from the messy structural work to the refined final fit-out.
The Design-Build Speed Advantage The traditional "Designer then Builder" model is slow because of the constant back-and-forth. Our unified team moves faster because our construction crew is involved in the design meetings. We solve "buildability" issues on paper, not on-site where they cause weeks of delays.
Procurement: The Silent Killer Most delays happen because a specific tile or custom door didn't arrive on time. We identify "long-lead items" months in advance, placing orders the moment the design is signed off. This ensures that when the site is ready for the finish, the materials are already in our warehouse.
Managing the Critical Path Construction is a puzzle. You can't paint before the plaster is dry, and you can't plaster before the wiring is tested. We manage the "Critical Path" with an iron fist, ensuring that no trade is waiting on another, keeping the momentum high.
Communication is the Real Timeline You won't be left wondering why the site is quiet. We provide regular updates on project milestones, so you understand exactly where we are in the journey. Transparency about the project timeline is how we build trust throughout the build.
Building in a Contingency Honesty is better than a fake promise. We build a realistic buffer into every schedule for the unexpected—like site conditions or shipping delays. This ensures that the move-in date we give you is one you can actually plan your life around.
Seamless Handovers The end of the timeline is just as important as the start. We dedicate the final weeks to snagging and deep cleaning, ensuring that when we hand over the keys, the home is 100% ready for you to walk in and start living.